Antiqbook

Murzaev, A. A. — Setevoe planirovanie remonta v mashinostroenii (Russian edition)

1971. 104 pp. Language: Russian. Condition: fair. Defects: stamps, signs of use. Further condition notes by the seller (original wording, transliterated): 'Shtamp ne sushestvuyushchey biblioteki'. Photos of the copy offered are available on request. Ships from Ukraine by Nova Post with tracking after receipt of payment (bank transfer or PayPal); delivery time 12–28 business days including customs clearance. We ship to all 214 countries served by Nova Post. Shipping for this book (up to 1 kg): Germany €19.60, France €28.60, Netherlands €24.30, Belgium €29.10, Austria €28.60, Switzerland €45.20, United Kingdom €28.60, USA €19.40; other countries €11.20–€45.20. The exact amount is confirmed when we accept your order. The parcel is sent from outside the EU/UK/Switzerland. Import VAT on books (e.g. Netherlands 9 %, Germany 7 %, Belgium 6 %, France 5.5 %, Switzerland 2.6 %, UK 0 %) and a customs handling fee of the carrier may be charged to the buyer on delivery; they are not included in the price. Consumers in the EU have the statutory 14-day right of withdrawal (see the seller terms). If the book does not match the description or is damaged in transit, please contact us right after receipt.

Machine translation by Google. The original description of the seller is leading. Log in or create an account to translate descriptions. Accedi
Numero libro: KNY10250201 €14.30 ($15.63 | £11.94 | ¥2,494)
Azioni
Richiedi informazioni Torna ai risultati
Prezzo
EUR 14.30
Autore
Murzaev, A. A.
Anno
1971
Legatura
Brossura
Lingua
Russian
Parole chiave
Russian books, Russian language, science, scholarly, technology